A country in transformation. A project on an international scale.
EXPO 92 and the Barcelona Olympic Games marked an exceptional moment for Spain. Two international events that drove a profound urban and construction transformation and required the execution of numerous structures within very tight deadlines. In this context, MAQUIOBRAS provided vertical and horizontal formwork solutions for different construction needs.
A challenge defined by time
Preparations for these two major events concentrated intense construction activity. Buildings, sports facilities and new urban spaces had to be ready by a date that allowed no delays.
For those involved in these works, the challenge lay not only in solving each construction element, but also in keeping up with the pace demanded by the schedule. Material availability and the ability to respond to the needs of the works thus took on special importance.
Solutions for different construction needs
MAQUIOBRAS supplied materials for the execution of walls, columns and slabs, combining vertical and horizontal formwork solutions.
The diversity of elements and construction types required versatile solutions and an agile supply response. The aim was to make the necessary materials available to the works to keep pace with their execution.
An experience that is part of our history
Participation in the works linked to EXPO 92 and the Barcelona Olympic Games represents a significant stage in MAQUIOBRAS' history.
When execution time is part of the challenge, responsiveness also builds.
A context of major projects, demanding deadlines and multiple construction needs that put to the test one of the capabilities that remain part of our way of working: responding with technical solutions wherever the project needs them.